The work focused on Coal seam No. 3 at Haichatan Coal Mine and the Jingbian–Yulin refined-oil pipeline that traverses the site. The mine sits in the southern Jurassic coalfield of northern Shaanxi and covers roughly 156.13 km², with a designed output of 5.00 Mt/a. Coal seam thickness in the study area averages 2.56 m and dips gently. The pipeline comprises western and eastern branches that converge northeastward; its straight-section wall thickness is 6.4 mm, outside diameter 273.1 mm, design pressure 6.3 MPa, and burial depth was modeled at 2.0 m with sandy surrounds. The original design equivalent stresses cited in the source were 196.1 MPa (straight section) and 258.1 MPa (elastic-laying condition), both below the adopted combined-stress limit of 261 MPa.
Investigators built a coupled analysis framework to move from predicted ground movement to pipeline combined stress. First, the probability integral method provided surface subsidence, tilt, horizontal strain, and curvature fields; the authors then extracted the components aligned with the pipeline. That three-dimensional displacement field was applied to a nonlinear Winkler foundation model implemented in ANSYS to simulate pipe–soil interaction and compute combined stress and displacement. The paper reported that this two-step coupling—probability integral outputs driving a nonlinear pipe–soil finite-element model—permits assessment of how panel layout, extraction extent, and mining thickness translate into pipeline loads.
Sixteen working conditions were defined by combining two pipeline branches (western and eastern), two mining scales (three-panel extraction versus single-panel cases), and four equivalent mining-thickness levels. For the case of full-thickness extraction across three panels, the maximum predicted ground subsidence along the western branch reached 1,480 mm; the eastern branch reached 1,634 mm. The corresponding maximum pipeline equivalent stresses were 728 MPa for the western branch and 946 MPa for the eastern branch. The authors reported strength-utilization ratios of 2.79 and 3.62 for those branches under full extraction, indicating stresses well above the adopted combined-stress limit.
Reducing the effective mining thickness markedly changed the computed response. When effective thickness was reduced to 0.2M, predicted equivalent stresses fell to 255 MPa (western) and 227 MPa (eastern). Even so, the western branch remained close to the adopted limit, with a reported strength-utilization ratio of 0.977. The study team concluded that effective mining thickness exerted a dominant influence on predicted pipeline stress across the scenario matrix.
The source reviewed common risk-control measures, including protective coal pillars, limited-thickness extraction, backfill mining, trench excavation, pressure reduction (depressurization), pipeline lifting, and monitoring. Considering equipment adaptability and resource recovery, the authors proposed a candidate control strategy that combined a 2.3 m mining-thickness limit with trench excavation, pressure reduction, and selective pipeline lifting as needed. They emphasized that adopting this thickness limit alone does not establish compliance; the limit must form part of an integrated intervention plan tied to observed deformation and calibrated models.
To support staged decision-making, the authors proposed a monitoring framework that integrates multiple data streams. InSAR and ground survey measurements provide basin-scale subsidence and local transect validation. Pipeline strain monitoring yields direct structural response data, while trench-displacement measurements offer a focused readout of near-pipe soil movement. The study team recommended using these data to calibrate the coupled model iteratively and to trigger interventions according to pre-defined thresholds. The source did not prescribe specific sensor types, sampling frequencies, or alarm thresholds; those parameters were left to engineering implementation and site-specific calibration.
The authors noted that the proposed safety boundary and the candidate 2.3 m thickness control require further verification. Model outputs depend on the probability integral parameterization, the nonlinear Winkler representation of pipe–soil mechanics, assumed soil properties, burial depth chosen for the model, and the equivalent-stress limit adopted from original design conditions. The source did not report detailed sensitivity analyses for all input uncertainties, nor did it provide specific operational thresholds or monitoring alarm settings. Field verification—using the staged monitoring program the authors proposed—was recommended to confirm the modeled responses and to validate the effectiveness of the combined trenching, depressurization, and lifting interventions.